01
Capacity & continuity
“Can this shop deliver the full quantity, on schedule, run after run — and absorb a rate increase without dropping a beat?”
- ✓Machine redundancy so one downed spindle doesn't stop a program
- ✓Realistic, demonstrated throughput — not a hopeful quote
- ✓Condition-based maintenance instead of run-to-failure
- ✓Headroom to scale when the OEM ramps the build rate